How Much Epoxy for a Bar Top?

Short answer: a typical 8 ft × 2 ft bar top takes about 1.25 gallons of mixed epoxy for one ⅛" flood coat, around 1.5–1.7 gallons with edges and drip loss. Plan a thin seal coat too if the wood is bare.

How it works

Top volume = length × depth × thickness. Edges are estimated as the perimeter × edge height × a thin 1/16" film, since epoxy runs off vertical edges rather than building up. Divide cubic inches by 231 for gallons.

Bar top chart (⅛" coat, +15%)

Bar sizeEpoxy
6 ft × 18 in0.81 gal
8 ft × 2 ft1.43 gal
10 ft × 2 ft1.79 gal
12 ft × 2 ft2.15 gal
8 ft × 3 ft2.15 gal

Chart excludes edges.

FAQ

How much epoxy do I need for an 8 ft bar top?

About 1.25 gallons for a ⅛" coat on an 8 × 2 ft top, roughly 1.5 gallons with edges and drips.

How thick should a bar top epoxy coat be?

Most bar and tabletop epoxies self-level to about ⅛" per coat. For a thicker finish, do multiple coats rather than one thick pour.

Do I need a seal coat on a bar top?

On bare wood, yes. A thin scraped seal coat stops air bubbling out of the wood into the flood coat. Add about 25% of a flood coat's volume.

Bar top epoxy vs deep pour?

Use bar/tabletop epoxy for the hard, heat-resistant top coat. Deep pour is softer and for thick fills.

Related: 4×8 sheet · countertop calculator · tabletop coating · project cost

Recommended supplies

As an Amazon Associate, ResinMath earns from qualifying purchases.